Contact
Organizers
- Dan Flickinger
- Jan Hajič
- Marco Kuhlmann
- Yusuke Miyao
- Stephan Oepen
- Daniel Zeman
email:
email:
sdp-organizers@emmtee.net
[06-feb-15] Final evaluation results for the task are now available; we are grateful to all (six) participating teams.
[08-dec-15] The evaluation period is nearing completion; we have purged inactive subscribers from the task-specific mailing list and sent out important information on the submssion of system outputs for evaluation to the list; if you have not received this email but are actually preparing a system submission, please contact the organizers immediately.
[17-dec-14] We are about to enter the evaluation phase, but recall that the closing date has been extended to Thursday, January 15, 2015. We have sent important instructions on how to participate in the evaluation to the task-specific mailing list; if you plan on submitting system results to this task but have not seen these instructions, please make contact with the organizers immediately.
[22-nov-14] English ‘companion’ syntactic analyses in various dependency formats are now available, for use in the open and gold tracks.
[20-nov-14] We have completed the production of cross-lingual training data: some 31,000 PAS graphs for Chinese and some 42,000 PSD graphs for Czech. At the same time, we have prepared an update of the English training data, with somewhat better coverage and a few improved analyses in DM, as well as with additional re-entrancies (corresponding to grammatical control relations) in PSD. The data is available for download as Version 1.1 from the LDC. Owing to the delayed availability of the cross-lingual data, we have moved the closing date for the evaluation period to mid-January 2015.
[14-nov-14] An update to the SDP toolkit (now hosted at GitHub) is available, implementing the additional evaluation metrics ‘complete predicates’ and ‘semantic frames’.
[05-aug-14] We are (finally) ready to officially ‘launch’ SDP 2015: the training data is now available for distribution through the LDC; please register for SemEval 2015 Task 18, and within a day (or so) we will be in touch about data licensing and access information.
[03-aug-14] Regrettably, we are running late in making available the training data and technical details of the 2015 task setup; please watch this page for updates over the next couple of days!
[01-jun-14] We have started to populate the task web pages, including some speculative information on extensions (compared to the 2014 variant of the task) that we are still discussing. A first sample of trial data is available for public download.
Designed by BhMad Studio | Powered by GetSimple